Machine hall ventilation audit

Comprehensive study to analyze the present situation in the machine hall ventilation and to give recommendations how to improve ventilation and working climate as well as reduce moldiness and corrosion.

The Machine hall ventilation audit includes:

Machine Hall Ventilation

  • Air balance measurements
  • Water balance measurements
  • Machine hall temperature and humidity levels
  • Misting at paper machine wet end
  • Visual inspection of fans, hoods, ducts, valves, hatches, heat recovery systems

Hood air balance

  • Hood air and water balance calculations 
  • Hood zero levels 
  • Water and humidity load to machine hall 
  • Visual inspection and conditions of the hood and its auxiliary equipment

After the audit and comprehensive discussions with the customer, we provide a complete written report summarizing necessary actions for production optimization.